Regulation (EU) 2024/2847EU Cyber Resilience Act
Cyber Resilience Act evidence for every release you ship to the EU.
CRA-Pilot turns each release SBOM into continuous vulnerability triage, OpenVEX decisions, 24-hour ENISA early-warning packets and an Annex VII technical file, kept in a ten-year, delete-blocked audit trail.
- Article 14 24h reporting: IN FORCE
- Full Annex I enforcement · 380d left
Local SBOM check runs in your browser — live OSV/KEV/EUVD lookup is strictly opt-in.
CRA compliance cockpit
Example Gateway 3.2.0 · sample data
Product classification
- Default
- Important I
- Important II
- Critical
Annex III, Class I, point 12: routers, modems and switches
SBOM coverage
412 components · CycloneDX 1.6
24h ENISA early warning
P0 · KEVActively exploited vulnerability
Awareness confirmed · early warning due in
17h 42m
- 24 h early warning
- 72 h notification
- Final report
VEX status
- Not affected
- 38
- Under investigation
- 5
- Affected
- 3
- Fixed
- 12
Built on the formats and provisions auditors check
CycloneDX
1.5 and 1.6 SBOMs
SPDX
2.3 and 3.0 SBOMs
OpenVEX
v0.2 statements, CycloneDX VEX export
Annex I
Essential cybersecurity requirements
Article 14
CSIRT and ENISA SRP reporting
How CRA-Pilot works
From release SBOM to regulator-ready evidence
Three steps run on every release, so the evidence an auditor or a market surveillance authority asks for already exists when they ask.
- 1
Step 1: Ingest SBOM (CycloneDX / SPDX)
Upload the SBOM of every release or derive one from your lockfile. Each release is diffed against the last, so new components are visible before they ship.
- CycloneDX 1.5/1.6 and SPDX 2.3/3.0 in, schema-validated CycloneDX 1.6 stored
- npm, pnpm, Poetry, pip, Cargo and Go lockfiles
- Release-to-release component diff
Evidence: Annex I, Part II(1) SBOM
- 2
Step 2: Continuous CVE & VEX triage
Components are matched against EUVD, CISA KEV and OSV.dev. Actively exploited findings become P0, and every decision is recorded as an OpenVEX statement.
- P0 for EU or CISA KEV entries, P1 for CVSS 9+ with high EPSS
- OpenVEX v0.2 triage with reviewer identity
- OpenVEX and CycloneDX VEX export
Evidence: Annex I, Part II(2) vulnerability handling
- 3
Step 3: 24h ENISA early warning & Annex I technical file
The Article 14 war room runs the 24-hour, 72-hour and final-report clocks from confirmed awareness and assembles the ENISA SRP packet.
- 39-field ENISA packet, sealed submission receipt
- Annex V declaration, Annex VII evidence bundle
- Ten-year retention with deletion blocked
Evidence: Article 14 records and Annex VII file
- Member State CSIRTs mapped for reporting routes
- 27 / 27
- Early warning and notification clocks, then the final report
- 24 h · 72 h
- Incident and compliance records, retained and protected from deletion
- 10 years
- Uploaded by the free checker: it runs in your browser
- 0 bytes
Who it is for
For manufacturers placing products with digital elements on the EU market
IoT and embedded manufacturers
Gateways, cameras, controllers and connected consumer devices. Many are Annex III important products, such as routers, network interfaces or smart-home security, which changes the conformity route.
- SBOM and diff for every firmware release
- Annex III and IV classification per product
- Declared support period of at least five years
B2B software and SDK vendors built on open source
Installable software, SDKs and libraries you sell are products with digital elements. Most of the code is open source, so the vulnerability load sits in transitive dependencies.
- Lockfile-derived SBOMs on every build
- Exploited-first triage with OpenVEX decisions
- VEX exports for customer security reviews
Vendors outside the EU exporting into it
The CRA follows the product, not the headquarters. Importers and distributors must confirm the CE marking, the technical documentation and a vulnerability contact before they sell your product.
- Annex V EU declaration of conformity
- Annex VII technical file and evidence bundle
- Coordinator CSIRT route in all 27 Member States
See your CRA gaps before an auditor does.
Drop a CycloneDX, SPDX or package.json file into the free checker for an Annex I gap checklist and a 0 to 100 readiness score in seconds. Nothing is uploaded.